Primary School Re-Roof

our story.

Re-Roof to Primary School

Market:

Education

Key Services:
  • Full Project Management as Principal Contractor
  • Licensed asbestos roof removal with full containment, air monitoring and certified disposal with trusted and certified Asbestos removal company.
  • Careful staging of works to minimise disruption to the education environment.
  • Strict compliance with WorkSafe NZ and Ministry of Education requirements.
  • Detailed health and safety planning.
  • Replacement of substrates and structural elements where required.
  • Upgraded insulation to meet current Building Code standards.
  • Environmental controls for dust, noise and debris management.
  • Full quality assurance processes and producer statements.
  • Full replacement of roofing.
  • Manufacturer and workmanship warranties for peace of mind

Project Overview

DPS was engaged as Principal Contractor to deliver a full re-roof of an operational primary school, including the safe removal of existing asbestos roofing materials.

Working within a school environment required careful planning, staged delivery and strict health and safety controls to ensure the safety of the school and the wider community at all times. Our team implemented comprehensive asbestos management procedures, including licensed removal, air monitoring and certified disposal, in full compliance with WorkSafe NZ regulations.

The project involved the removal of the existing asbestos, remediation of affected areas, and installation of a new roofing materials designed for durability and long-term performance. Insulation was upgraded to meet current Building Code requirements, improving thermal efficiency across the school facilities.

Clear communication with school leadership and stakeholders was maintained throughout the project, with works carefully programmed around school activities to minimise disruption.

The project was successfully delivered on time, with full asbestos clearance certification and complete compliance documentation provided at handover, ensuring a safe, modern and future-proofed learning environment.

Key Facts

  • Licensed asbestos removal including staged removal of roofing, air monitoring, decontamination, and independent clearance before and throughout the works.
  • Site Establishment in an educational environment which including fencing, signage, access control and coordinated waste management.
  • Removal and disposal of all associated materials across the school.
  • New roofing installation
  • Working at height controls with full scaffolding, shrink wrap, EWP’s.
  • Project completion on time and to the satisfaction of the client.

Challenge met

  • Delivered within the fixed timeframe available to us in time for the students to return for the new year.
  • Developed a detailed programme to ensure the project would be delivered on time.
  • Secured materials and team requirements to deliver the project.
  • Maintained uncompromised H&S standards throughout the project.
  • Carried out licensed asbestos removal with monitoring and clearance certification.
  • Responded to unforeseen structural changes which didn’t alter the programme.

Overall, we delivered a safe, compliant re-roof delivered on schedule and couldn’t be prouder of the team.